I'm going to build a shed and thought I'd seek the wisdom here about the longevity of RR ties on a washed shale base. I have a spot grubbed out and will have the final grade about 4" above existing grade with 100% 1"- crushed ledge (known as blue shale here).
Thoughts?
Should I used P.T. lumber as a base instead?
TS
Thoughts?
Should I used P.T. lumber as a base instead?
TS