As I am slowly finishing the inside of my garage (pole shed) I am working on the ceiling. The finished ceiling will be white interior grade steel with 1" of poly insulation that has 2 foil layers on each sheet. I will seal all the edges. Here is my question...
The builders used a layer of Reflectix single bubble wrap directly under the roof layer as a vapor barrier. There was a lot left over and I stapled what was left to the bottom of the trusses and it will between my ceiling steel and the insulation sheets. There was enough to do 3/5th of the ceiling. There are mixed opinions online about the benefits of this stuff. Is it worth it for me to buy more to finish the ceiling or am I just wasting money with the way I am insulating?
The builders used a layer of Reflectix single bubble wrap directly under the roof layer as a vapor barrier. There was a lot left over and I stapled what was left to the bottom of the trusses and it will between my ceiling steel and the insulation sheets. There was enough to do 3/5th of the ceiling. There are mixed opinions online about the benefits of this stuff. Is it worth it for me to buy more to finish the ceiling or am I just wasting money with the way I am insulating?