I plan on tackling the summer project of replacing/upgrading the steel baffle plates on my Oslo with the newer vermiculite option. I have read this thread:
https://www.hearth.com/talk/threads/28466/
I plan on replacing the top plate gasket (my manual calls for 3/8" gasket) at the same time. Is there anything else I should be aware of/prepared for to complete this project? Thanks,
Sully
https://www.hearth.com/talk/threads/28466/
I plan on replacing the top plate gasket (my manual calls for 3/8" gasket) at the same time. Is there anything else I should be aware of/prepared for to complete this project? Thanks,
Sully