Just brought home a NC13 Englander and am setting it up. how tightly do I join the black pipes together between the flue collar on the stove and the tie in at the ceiling for the chimney? If it is completely tight with no movement and I install the upper end in the chimney how do I get the wood burner/ flue collar under it? Tilt the stove? try tilting/bending pipe to make it fit then straighten it out?
Also do I apply that black pipe cement between sections or just compression holds them together?
Thanks for any help you can give me.
Also do I apply that black pipe cement between sections or just compression holds them together?
Thanks for any help you can give me.
broken link removed to http://www.northlineexpress.com/itemdesc.asp?ic=5IM-BM0042). They are common and available locally. No need for furnace cement between joints. Just seat them in as far as possible and secure with 3 evenly spaced screws. Make sure the corrugated end of the black pipe points toward the stove--thus keeping creosote from dripping out of the pipe.