hi all.im in the process of removing my vf55 and installing a p68.i have an 18" adjustable section that needs to slide over a 5ft section of pipe.the overlap is gonna be about 11".im dryfitting all the pipe before the actual
install and cannot for the life of me get anywhere close to the 11" overlap i need.any suggestions on what i can use to lube it up.Peace,Corkman
install and cannot for the life of me get anywhere close to the 11" overlap i need.any suggestions on what i can use to lube it up.Peace,Corkman