hi I just purchased a 1982 vc resolute with wood kit and coal kit. the seals were all shot and it had a lot of surface rust. so I disassembled it and cleaned it all up I order a seal kit and two tubes a furnace cement
My questions is
1 is two tubes enough To reasonably the whole stove
2 does any one have words of wisdom to share should I cement the fire back to the back first or assemble the box then install the back
![[Hearth.com] VC resolute rebuild [Hearth.com] VC resolute rebuild](https://www.hearth.com/talk/data/attachments/244/244219-8a662c521af898f2bd902c180d9e32b0.jpg?hash=fB7GBcnCab)
My questions is
1 is two tubes enough To reasonably the whole stove
2 does any one have words of wisdom to share should I cement the fire back to the back first or assemble the box then install the back
![[Hearth.com] VC resolute rebuild [Hearth.com] VC resolute rebuild](https://www.hearth.com/talk/data/attachments/244/244219-8a662c521af898f2bd902c180d9e32b0.jpg?hash=fB7GBcnCab)
Last edited by a moderator: