New duratech black pipe will be here today and I have a question. I needed to buy a 1' 2' and 4' joint pieces for my install. Is there any particular order I should install them? Since I hadn't installed stove pipe before I thought it best to ask before installing. My order includes a skirted stove top section and slip joint for the ceiling. This based on help I received on my previous post.
TIA
TIA