I see now about the Cathedral Ceiling Support box. That is a more sound option. I do see the installation instructions now online and have downloaded them. I can remove the drywall and frame for the support box no problem.A cathedral ceiling support box gets hung between the rafters. It solves a couple issues because it can be hung plumb and is the trim + support, all in one. This is in lieu of the roof top support bracket, trim collar, and finishing collar.. Download the Duratech installation manual for more details. Note, the order is missing a storm collar. Also, save receipts. The DVL stove adapter is not needed for several stoves and a sloppy fit. In many cases the DVL pipe itself fits a lot better.
View attachment 343996
The hearth base needs at least an R=1 rating. What are the construction details for this?
Hearth base construction shall be:
- Steel studs on edge measure 3-5/8" tall (3-5/8" open space under Durock framed 12" on center for support)
- 3 layers of 1/2" Durock (plus thinset mortar)
- 1 layer of 1/2" ceramic 6"x6" tiles (plus that thinset mortar
All constructed will raise the stove off of the floor 6".
Last edited: