I just finished up a retaining wall, back filled it and planted. Thursday is supposed to be the day we pour the basement floor.
I have water all over the place. I cIeaned the spring box and back flushed the pipe to the old cistern, and now I have more water than I can deal with. I have timers set to squirt it out on the field twice a day.
We hit another small spring while digging the pits for the two new cisterns, and as soon as that dries out enough to get a truck in, two new cisterns will be placed. Then it is trenching time. I am still waiting on bids for geothermal as if we go that way I will use the water trenches for the geothermal piping.
I'm trying to get things in order for siding to start next week. As soon as that is going, I have to build another two retaining walls. I bought 900 70 pound blocks for the walls. I figure there is about 15,000 pounds of block in the wall just finished.
I was contemplating buying a logging truck of buckskin tamarack, but I have no idea of when I could CSS.
I'd like to get the outside pretty well finished, the basement interior framed by October and wire and plumb over the winter.
All this on top of trying to run the business.
I have water all over the place. I cIeaned the spring box and back flushed the pipe to the old cistern, and now I have more water than I can deal with. I have timers set to squirt it out on the field twice a day.
We hit another small spring while digging the pits for the two new cisterns, and as soon as that dries out enough to get a truck in, two new cisterns will be placed. Then it is trenching time. I am still waiting on bids for geothermal as if we go that way I will use the water trenches for the geothermal piping.
I'm trying to get things in order for siding to start next week. As soon as that is going, I have to build another two retaining walls. I bought 900 70 pound blocks for the walls. I figure there is about 15,000 pounds of block in the wall just finished.
I was contemplating buying a logging truck of buckskin tamarack, but I have no idea of when I could CSS.
I'd like to get the outside pretty well finished, the basement interior framed by October and wire and plumb over the winter.
All this on top of trying to run the business.
Last edited: