Finally installed the F600 after it was sitting on the hearth since May. The liner was a bit of a pita. 6 inch flex going down a 7X13 20 ft flue. Had to use 2 adjustable 90s to get to the stove. Secure everything with screws and on spot where the T cleanout met with one of the 90s, the fit was not as snug as I would have liked, so I used a little cement. Did a match test around all fittings, and everything was great! Put a lot of roxul in there and then rested a block off plate.
I am pumped and ready for the cold. Had first break in fire and got her to 200 degrees and she is beautiful
Will have a 2nd today and final tomorrow. (and the ash door was open for only a few second to get her going)
Oh yeah, and just found out the wife is pregnant with our second child
Great days!
I am pumped and ready for the cold. Had first break in fire and got her to 200 degrees and she is beautiful

Oh yeah, and just found out the wife is pregnant with our second child
