Im a few weeks out of installing a stove in my house. A slight oversight on my part, has led to a conflicting location of where i had initially intended the support box to be installed. When i installed the ceramic tile floor and wall heat shield, i was sure i had a good clear spot between the rafters. Well once i got back up in the attic last week, taking final measurements for pipe, as i dug down deeper in the insulation (over top a vaulted ceiling), i can now see that a section of air duct will be in the way, i cant believe i did not see this when i was up there taking rough measurements last time... i was more interested in where the hole will be with regards to the roof's ridge line i suppose.... and it was probably 140F up there, and after a while, anyone will start to go crazy...
If i move the stove over roughly ~1ft to clear the duct... i think it will be too close to the edge of the tile/carpet seam, plus it will fall out of the manual's recommended floor clearances with regard to the side measurement. So i wondered about an offset, using 45's or 30's, but i cant find any mention of offsets in the stove manual for a minimum height above the stove where it can be installed. The stove will be a Drolet Myriad.
I have the single wall telescopic pipe i had planned to use from the stove to the ceiling box, and what turned out to be pretty simple, is now looking like a bit of trouble. There will be 12ft of triple wall pipe in the attic/roof, from the box to the cap.
If i move the stove over roughly ~1ft to clear the duct... i think it will be too close to the edge of the tile/carpet seam, plus it will fall out of the manual's recommended floor clearances with regard to the side measurement. So i wondered about an offset, using 45's or 30's, but i cant find any mention of offsets in the stove manual for a minimum height above the stove where it can be installed. The stove will be a Drolet Myriad.
I have the single wall telescopic pipe i had planned to use from the stove to the ceiling box, and what turned out to be pretty simple, is now looking like a bit of trouble. There will be 12ft of triple wall pipe in the attic/roof, from the box to the cap.