That's a nice unit. Redundancy is important. In the prepping world they say one is none, two is one and three is two for redundancy. I am working hard to get all three to come together. I have about 1/3 of the solar I need. It recharges my 4k power station. The power station has 120v backup and if the grid goes down the power station, via an MTS picks up the designated 6 most important circuits. Then I have the generator to augment the solar panels to recharge the power station or I can connect the generator directly to te house if the power station has a malfunction.
And then I have the inverter in my truck that can also supply short term power.
Right now I have all the pieces, it's just getting them all put together. I do a little bit everyday. I love tinkering, so I doubt I will ever be done.
I thought I was done with the MTS and Main panel, until I discovered a discrepancy between 2 different sets of notes and realized I had mis-identified a circuit in my panel and put it on the MTS, but when I double checked, somehow I grabbed the wrong circuit. It's literally a 5 minute fix, so not a real issue. I also identified about a foot of 1/2" copper water pipe, 2 elbows and a shutoff valve that are highly corroded. The pipe goes to an outside faucet, so it should be fairly straight forward to cut out the affected section and replace it. I also want to add a surge protector to my panel. That should nearly complete the utility room work, except for covering the walls with beadboard. The beadboard can be done in any weather, but I need to go work on the other end of my power project.